If you are converting a property into an HMO, building control approval is not optional. Your technical drawings must demonstrate compliance with the Building Regulations before work starts, and the inspector will visit during the build to confirm the work matches the approved drawings.

For HMO conversions, fire safety is the area where building control is most demanding, and where we see the most problems when technical drawings have been done poorly or not at all.

This article breaks down what building control will focus on most closely when assessing your HMO conversion.


Fire Doors

Fire doors are one of the most common areas where HMO projects run into trouble. Building control expects fire-resisting doorsets that meet specific performance standards, not standard internal doors with intumescent strips added as an afterthought.


For most HMO conversions, a 30-minute fire door (tested to BS EN 1634-1) is required on every room opening onto an escape route. That includes all bedrooms, kitchens, and communal rooms that open onto hallways or stairwells. Each doorset must include a combined intumescent and cold smoke seal and a self-closing device.


Fire doors are complete assemblies. The leaf, frame, seals, hinges and closer all need to be compatible and tested as a set. Swapping out individual components or using a fire-rated leaf in a non-rated frame can invalidate the rating entirely. Third-party certification (such as BWF-Certifire or BM TRADA Q-Mark) is strongly recommended and increasingly expected by building control inspectors.

Every fire door must close fully under its own power, and gaps must be no more than 3mm (or as specified by the manufacturer). Any glazed panels in fire doors must use fire-rated glass in a fire-rated bead system.


Alarm Systems

The alarm grade and category for your HMO depend on the property’s size, layout, and number of occupants. Building control assesses this against BS 5839-6:2019, and getting it wrong can mean ripping out and replacing an entire system.


For most HMO conversions, the standard is a Grade D1 system. That means mains-powered detectors with integral tamper-proof battery backup. Each detector must be interlinked so that activation in one room triggers all alarms throughout the property.


The category determines where detectors are placed:


LD2 coverage is typically accepted for smaller shared houses (up to six occupants, one to three storeys). LD2 places detectors in escape routes and high-risk rooms such as kitchens and living rooms.


LD1 coverage is required for most larger or higher-risk HMOs, including properties with seven or more occupants or where escape is more complex. LD1 covers all areas including bedrooms, cupboards over the escape route, and the loft space.


For larger bedsit-style HMOs at four or more storeys with seven or more occupants, some councils require a Grade A system. This is a conventional wired panel system with professional monitoring, and it is significantly more expensive to install. Confirming this requirement early in the design process can save a considerable amount of time and money.


Each bedroom in a bedsit HMO should also have a stand-alone sealed 10-year battery smoke detector, in addition to the interlinked system. Heat detectors are used in kitchens where a smoke detector would cause nuisance alarms.


Compartmentation

Compartmentation is the construction that contains a fire within a defined area and protects escape routes. For HMOs, this is critical because multiple unrelated occupants share the building, and escape routes must remain tenable for long enough for everyone to get out.


Building control will expect:


30-minute fire-resisting construction on all walls, floors, and ceilings that form part of an escape route or separate individual letting rooms from each other. The walls must be full-height (slab to slab, not just to the ceiling), properly sealed around service penetrations, and constructed with fire-rated materials.


30-minute separation between a basement or lower ground floor and the rest of the property. This includes a fire door at the top or bottom of the basement stairs and fire-resisting construction to the basement ceiling.


Service penetrations such as pipes, cables, and ventilation ducts that pass through fire-resisting elements must be fire-stopped using appropriate intumescent products. This is an area building control inspectors check closely, and one that is frequently done poorly on site.


Escape routes must be kept clear of combustible storage. Cupboards on or adjacent to escape routes must be fire-resisting construction with intumescent-sealed doors and detection linked to the main alarm.


Emergency lighting to BS 5266-1 is required where escape routes lack natural or borrowed light, or where the route is complex. In practice, most HMO conversions will need at least some emergency lighting.


How to Get It Right

The best way to avoid building control problems is to design the fire safety strategy into the technical drawings before work starts. That means specifying every element upfront: fire door ratings, alarm grades and categories, compartmentation lines, and fire stopping details. Working these out on site is where projects go wrong.


A full plans submission to building control, with all fire safety elements detailed, gives you formal approval before construction begins. The alternative is a building notice, which gives you no upfront certainty. Any issues are only identified during the build, when resolving them is more expensive.


At Maine Blueprints, fire safety design is built into every set of technical drawings we produce for HMO conversions. We work with the relevant building control standards and your council’s specific requirements to make sure the submission is right first time. If you are planning a conversion, get in touch and we will make sure your fire safety design is compliant before your builder starts on site.


 
 
 

Comments


architectural design uk

CONTACT US

Reach out with any
questions or Enquiries

PHONE

North West

Tom  07718 789769

​

North East

Steve 07904 719522

EMAIL

  • LinkedIn
  • Facebook
  • Instagram

© 2025 by Maine Blueprints
 

bottom of page