Planning Drawings vs Technical Drawings: What They Are, Who They Are For, and Why You Need Both

If you are planning a HMO conversion, a property extension, or any kind of residential development, you will need two separate sets of drawings before your project is ready to build. Planning drawings and technical drawings serve different purposes and go to different people. Confusing them, or assuming one replaces the other, is one of the most common mistakes we see from property investors, and it is almost always an expensive one.
Below, we break down what each set covers, who uses them, and why you need both to keep your project on budget and on schedule.
What Are Planning Drawings?
Planning drawings are the documents you submit to your local planning authority as part of a planning application. Their purpose is to show the council what you want to do and allow them to assess whether it is acceptable under local and national planning policy.
A typical set of planning drawings includes a location plan at 1:1250 or 1:2500, showing the site in its wider context, along with a site plan at 1:200 or 1:500 showing property boundaries, access, and relationship to neighbouring buildings. You will also need existing and proposed floor plans at 1:50 or 1:100 showing the current layout and what you intend to change, plus existing and proposed elevations showing the external appearance. A design and access statement explaining the rationale and how the scheme complies with policy rounds out the submission.
Planning drawings focus on layout, appearance, scale, and the impact of the development on the surrounding area. Construction details and structural calculations are not part of this stage. The planning officer reviewing your application is not assessing whether the building will stand up or meet fire safety standards. The assessment is about whether the proposed use is acceptable in that location
What Are Technical Drawings?
Technical drawings (also known as building regulations drawings or building regs drawings) are the documents you submit to building control and provide to your contractor. Their purpose is to show how the project will be constructed and demonstrate compliance with the Building Regulations.
A technical drawing set is far more detailed. It includes floor plans and sections at 1:50 or larger with full dimensions, wall build-ups, and material specifications. Structural calculations and details from a structural engineer cover foundations, steelwork, lintels, and load-bearing elements. Fire safety design sets out compartmentation, fire door specifications, and escape routes. On top of that, you need thermal calculations for Part L compliance, drainage layouts for foul and surface water, ventilation calculations for habitable rooms and kitchens, and window and door schedules with full specifications.
Building control assesses technical drawings against the Building Regulations, covering structure (Part A), fire safety (Part B), energy efficiency (Part L), ventilation (Part F), drainage (Part H), electrical safety (Part P), and several other areas. A full plans application to building control typically receives a decision within five weeks, extendable to two months by agreement.
Why They Are Separate Processes
Planning permission and building regulations approval are governed by different legislation. Planning falls under the Town and Country Planning Act 1990. Building regulations fall under the Building Act 1984 and the Building Regulations 2010 (as amended).
Different teams within the council assess each one (or a private approved inspector in the case of building control). Having planning permission does not mean your design complies with building regulations, and the reverse is equally true. We have seen cases where a planning-approved layout had to be redesigned because it could not achieve adequate fire compliance. We have also seen structurally sound schemes refused planning permission because of their impact on neighbours.
The two processes overlap in some areas, particularly around access and fire safety, but they are not interchangeable. You need both, and you need them done properly.
Why Your Builder Needs Technical Drawings
This is where the financial impact becomes real. When a contractor receives planning drawings and is asked to provide a fixed-price quote, the builder is being asked to price a project without knowing how it will be built. The structural requirements, fire safety specifications, insulation values, and drainage layout are all unknown at that stage. Every one of those unknowns gets priced at risk.
Contractors handle this in different ways. Some will price the more expensive option on anything uncertain. Others will add a blanket contingency. If drainage is unclear, the allowance might be generous or it might not cover what is actually needed. Either way, the quote is based on guesswork rather than a defined scope.
On a typical HMO conversion, we regularly see a difference of £10,000 to £20,000 between a quote based on planning drawings alone and a quote based on a full technical set. The builders are not inflating their prices. The gap comes from pricing uncertainty.
A complete technical set removes that problem. Your contractor receives a defined scope of work with construction details specified and materials listed. That translates into accurate quotes, comparable tenders, and significantly fewer variations during the build.
The Sequence That Works
For most HMO conversions and residential projects, the process runs as follows:
Start with a site visit and feasibility assessment to confirm the scheme is viable. From there, produce the planning drawings and submit them to the local planning authority. Once planning is approved, produce the technical drawings and structural calculations. Submit the technical set to building control for approval, and use the approved drawings to obtain contractor quotes. Construction begins once building control has approved the drawings and a contractor is appointed.
Each stage feeds into the next. Skipping a stage or doing them out of order creates problems that cost more to fix later.
What This Means for Your Project
If you are planning a HMO conversion, an extension, or a residential development, invest in both sets of drawings. The planning drawings get you through the council. The technical drawings get you through the build. Together, they protect your budget and your programme.
At Maine Blueprints, we produce complete drawing sets covering both planning and technical drawings for HMO conversions, extensions, and residential developments across England. If you want to discuss your project, get in touch with our team.
_edited.png)